industrial wastewater is channelled into a
decantation tank in order to separate and
subsequently remove the solid part. It is then
sent to the relevant purification plant, as
authorised and regulated by the contract.
Water deriving from civil use is, however, stored
in a reservoir, drained off and disposed of.
In general, in Romania analyses of industrial
wastewater are carried out annually, as
prescribed.
In 2019 testing was concluded of the chemical
product treatment for reducing the amount of
volatile organic compounds in the decantation
tank. However, at the Tunisia plant, water is not
used for production – it is only for civil use.
In 2022 Ratti SpA BC undertook a campaign to
identify the characteristics of the substances
present in the main water flows within the
departments. The analysis of the data reported
makes it possible to evaluate the possibility of
inserting intermediate purification and recycling
of water, in order to improve not only the quality
of the wastewater arriving at the purification
plant, but also to reduce the total consumption
of water.
5.2
In order to optimise water consumption, Less resources consumed,
the Ratti Group is launching a process which a better future
reduces water consumption during the
phases of the production process.
This will start with the Guanzate plant, The management of water resources
In order to optimise water consumption, the Ratti
which draws its water resources mainly Group is launching a process which reduces water
from dedicated wells. consumption during the phases of the production
process. This will start with the Guanzate plant,
which draws its water resources mainly from
Restricted Substance List) parameters as well dedicated wells.
as those that are key according to the ZDHC
programme. The analyses show that MRSL For a number of years the Group has regularly
substances have been eliminated from the verified water consumption by using a range of
production cycle. meters. This measurement network currently
consists of meters that must be read manually.
For Ratti SpA BC, the procedure for managing With the objective of reducing future water
water derived from manufacturing carried out at consumption, in 2021 Ratti SpA BC made a
the plant, including that from bathroom facilities, number of investments aimed at reducing
requires it to be channelled through the internal the consumption of the service facilities in
collection network, where it is filtered (through the factory. In particular, the revamping of the
bar screens) in a number of phases and pumped pumping system of the homogenisation tank was
into the accumulation basin of the system, before completed and, in the first half of 2021, SEAM
being subsequently sent to the purification plant, Engineering carried out a water balance test at
as per the Autorizzazione Unica Ambientale the Guanzate plant following a block diagram,
(Single Environmental Authorisation). measuring the quantity of water drawn, by type,
In the production plant in Textrom in Romania, and the quantity discharged.